The Chiba Plant, located inland, began operations in 1996, however, the effects of global warming began changing the production environment in 2005. The temperature in the area around the factory has risen, and higher outside temperatures during the summer has affected the production of frozen bread dough. Thinking back to the time when the facilities were updated, Mr. Nakajima, manager of the Frozen Production Department says, “Because it had become difficult to maintain the proper temperature to prevent fermentation problems with our existing refrigeration equipment, we needed to replace the system.”